project description
The Bokor Field is located within Baram Delta in the South China Sea, about 45KM North West of Lutong Miri, Sarawak with a water depth of approximately 70m. The main objectives of Bokor Phase 3 Redevelopment Project were to develop additional reserves through a combination of infill drilling and iWAG in the EF reservoirs and to achieve the first injection by 2020.
HGIS was awarded by Brooke Dockyard And Engineering Works Corporation to provide turnkey support services which includes Pre-Installation Survey for 3 x sites prior to installation and Positioning & Navigation support during 3nos of WHP platform installation. HGIS vast experiences in Platform T&I support entrust our clients that the structures are positioned within the target area as specified by Petronas Carigali. HGIS monitored and guide the SIMOPS movements of the barge and anchor handling tugs, as well as ensuring the congested area were safe.
HGIS scope of work includes the Surface & Underwater Positioning support onboard Work Barge Hilong 106, RB II Float Over Barge, Armada Firman 2, Dimensional Control Survey and Wave Rider Buoy. The Project Management Team has successfully managed to bridge the gap for all parties involved by understanding all the project requirement. In total, 18 offshore personnel was involved in this project which includes multiple crew change rotations.